Expertise

Piping

FULL SERVICE.

On many projects, piping systems end up on the critical path. CR Meyer’s Pipefitters and equipment installation crews work side by side to ensure the critical path duration is minimized. This allows more time for checkout activities, assuring a smooth start-up. CR Meyer can streamline the construction process with full service mechanical installation. By having the piping and equipment installation crews on the same team, there is more control of the duration and quality of the project, putting you on the fast track to making a profit. Certificates of Authorization by the American Society of Mechanical Engineers (ASME) and the National Board of Boiler and Pressure Vessel Inspectors (NBIC) permit CR Meyer to perform installations requiring ‘PP’, ‘U’, ‘S’ and ‘R’ stamps.

  • Power
  • Gas
  • Process Piping
  • Steam / Condensate
  • Lube Oil / Hydraulic
  • Pneumatic
  • Instrumentation
  • Plant Maintenance
  • Fabrication
I want to send a sincere thank you to all CR Meyer’s people for the success of the project. The craftsmen that were brought in by CR Meyer were very skilled in their respective crafts, had excellent work ethics and all worked towards a common goal.
Paper Industry Customer