On many projects, piping systems end up on the critical path. CR Meyer’s Pipefitters and equipment installation crews work side by side to ensure the critical path duration is minimized. This allows more time for checkout activities, assuring a smooth start-up. CR Meyer can streamline the construction process with full service mechanical installation. By having the piping and equipment installation crews on the same team, there is more control of the duration and quality of the project, putting you on the fast track to making a profit. Certificates of Authorization by the American Society of Mechanical Engineers (ASME) and the National Board of Boiler and Pressure Vessel Inspectors (NBIC) permit CR Meyer to perform installations requiring ‘PP’, ‘U’, ‘S’ and ‘R’ stamps.

  • Power
  • Gas
  • Process Piping
  • Steam / Condensate
  • Lube Oil / Hydraulic
  • Pneumatic
  • Instrumentation
  • Plant Maintenance
  • Fabrication
I just wanted you to know about the excellent job your team did. I look forward to finishing this project up and working together again on future projects. Thanks again for all the help on this project.
Converting/Printing/Plastics/Packaging Customer