Construction of Heavy Manufacturing Plant

Oshkosh, WI

Industry: General Industrial

Project Scope

A generator company had a well-crafted strategic plan and a sound vision for the future. A part of that vision was to design and construct a new, technologically advanced, highly efficient manufacturing facility to accommodate current growth and to place the organization in a favorable position for the future. The CR Meyer team assisted in the selection of a site suitable to the design and construction of the new facility. During the design process, the Owner requested the 10,000 square-foot main office be completed first, allowing the management staff to be on-site during the completion of the 100,000 square-foot manufacturing facility. CR Meyer redirected resources and expedited the delivery of materials and equipment to accomplish this goal without exceeding the original schedule.

Project Stats

  • Duration: 4 Months
CR Meyer played a key role as a partner in the overall success of our project. The entire construction team was fully engaged and committed to delivering the successful results of being under budget, starting up early and attaining end-of-curve production in unprecedented time.
Paper Industry Customer