PCMC Lines 2-5 Logsaw & Cassoli Replacement

Chester, PA

Industry: Pulp and Paper

Project Scope

This construction management project involved the demolition of an entire converting department, which was completed in three days and included four converting lines.

CR Meyer prepped and installed 13,000 square feet of new epoxy floor coating as well as supplied and installed new structural steel for the stairs and mezzanine.

The project required the installation of: two spirals, four logsaws, two laners, one wrapper, one case packer, one manipulator, 800 linear feet of overhead product conveyor, new cutoff collection system, all new air, hydraulic, fire protection, chilled water piping systems, and electrical installation of new wire, conduit, and cable trays for all new equipment.

Project Stats

  • CR Meyer Self-Performed: Construction Management, Demolition, Structural Steel, Concrete, Millwrighting/Alignment Services, and all Process & Utility Piping
  • 13,000 square foot of new epoxy floor coating

 

When it comes to safety and quality, data is important, but the true measurement comes down to attitude, respect, willingness to cooperate, acknowledgement of achievements and pride in a job well performed. Thank you!
Paper Industry Customer