Renewable Energy Project

Quinnesec, MI

Industry: Hydro/Power Generation

Project Scope

The New Steam Turbine included the following: Turbine Building, MCC Room, Steam Turbine, Equipment Foundation, Wood Yard Upgrade, Boiler Modifications, Cooling Tower Foundations, Pipe Bridge Structures, Steam/Miscellaneous Piping, and Underground Process Piping.

Project Stats

  • Overview: Boiler Upgraded
  • Biomass Handling System New Turbine Generator
  • Duration: 13 Months