Project Scope

CR Meyer was the general contractor responsible for the installation of a new Metso StreamLine Pro wrapping and handling system. Constructability reviews were held early in the project to reduce potential risks due to subgrade ground water. Minimizing the foundation pit depths reduced costs and eliminated the risks associated with dewatering the site. The fully automated roll wrapping and handling system included a modularized high capacity StreamLine Pro kraft roll wrapper with four industrial robots. The new conveyor system collects rolls from the paper machine and the off-machine coater areas and brings them to the new wrapper. After rolls are wrapped and labeled, they are moved to either the “in process” area or shipping warehouse. All actuators are electric or pneumatic.

Our crews were responsible for the demolition and excavation required to prepare the existing building for the new installation. We also installed the concrete foundations, equipment, and piping for the new wrapping and handling system.

 

I want to send a sincere thank you to all CR Meyer’s people for the success of the project. The craftsmen that were brought in by CR Meyer were very skilled in their respective crafts, had excellent work ethics and all worked towards a common goal.
Paper Industry Customer